Drug-resistant tuberculosis: Difference between revisions
From IDWiki
m (→) |
m (→) |
||
Line 65: | Line 65: | ||
|9 months from date FQN started |
|9 months from date FQN started |
||
|} |
|} |
||
* |
|||
[[Category:Tuberculosis]] |
[[Category:Tuberculosis]] |
Revision as of 17:58, 18 November 2022
- Mycobacterium tuberculosis infection that is resistant to both first-line drugs, isoniazid and rifampin
Classification
- Multidrug resistant tuberculosis (MDR-TB): resistance to isoniazid and rifampicin
- Extensively drug-resistant tuberculosis (XDR-TB): resistance to at least isoniazid and rifampicin, and to any fluoroquinolone, and to any of the three second-line injectables
- Totally drug-resistant tuberculosis (TDR-TB): not well-defined
Management
- 8 months of an intensive four-drug regimen that includes any four drugs to which it is susceptible, in order of preference:
- Any first-line agents to which it is still susceptible
- A fluoroquinolone (except ciprofloxacin)
- An injectable: kanamycin, or other parenteral agent
- Other second-line agents, starting with ethionamide
- Followed by 12 months of a less intensive regimen (at least three effective drugs), for a total of at least 20 months
Resistance To | Replace With | Regimen | Total Duration |
---|---|---|---|
INH | FQN | 6 months RMP+EMB+PZA+FQN | 6 months from date FQN started |
INH | FQN | 2 months RMP+EMB+PZA+FQN then 4 months RMP+EMB+FQN | 6 months from date FQN started |
RMP | FQN | 2 months daily INH+EMB+PZA+FQN then 10-16 months INH+EMB+FQN | 18 months from date FQN started |
RMP | None | 2 months INH+EMB+PZA, then 16 months INH+EMB | 18 months from date FQN started |
EMB | None | 2 months INH+RMP+PZA, then 4 months INH+RMP | 6 months from start of therapy |
PZA | None | 2 months INH+RMP+EMB, then 7 months INH+RMP | 9 months from start of therapy |
INH+EMB | FQN | 6 months daily RMP+PZA+FQN | 6 months from date FQN started |
INH+PZA | FQN | 9 months RMP+EMB+FQN | 9 months from date FQN started |
INH+EMB+PZA | FQN+injectable | 2 months TMP+FQN+injectable, then 7 months RMP+FQN | 9 months from date FQN started |